Scope of work:
⦁ The scope includes Engineering Procurement and Construction (EPC) of 24″ FBE coated underground pipeline approximately 43 KM with mechanical, civil, electrical and instrumentation works. Its also include the construction of right of way (ROW), thrust boring, installation of Cathodic Protection, LDS, RTUs, FOC, Scraper Launcher and Receiver and two above ground 24” MOVs and GOVs, etc.
Project Details:
Type of Project : LSTK (EPC)
Length of Pipeline : 43 km
Size of Pipeline : 24 inch
Location : Abqaiq to Al-Khobar SWCC
Duration : 2011 to 2013